American Fire Training Systems completed fire training structures. Click on the links to the right to see slide shows of the finished models, or click on the pictures below.

__________________________________________________________________________

Mattoon

Luling

 

Manhasset

Alsip                                         

 
Click on the picture to view the slide show

 Unit Specifications

5 40' Containers

4 Training Levels

2 Rappel Stations

3 Roof Hatches (Rappel)

9 Doors

8 Windows

1 24" Round Hatch

2 Interior Stair Cases

2 Exterior Stair Cases

2 Balconies

2 Decks W/Handrail

6 Swing Away Partitions

6 Moveable Track Walls

1 Drop Ladder W/Hatch

2 Bar Grated Decks

Galvanized Railings

Epoxy Paint Int./Ext.

Flashing Inner/Outer

Bedford

 
Click on the picture to view the slide show

Unit Specifications

6 48' Containers

1 40' Container

5 Training Levels

2 Rappel Stations

7 Non-Burn Doors

7 Non-Burn Windows

2 Burn Doors

2 Burn Windows

2 36x80 Walkthroughs

1 16'x17' Walkthrough

1 10'x8'-6" Walkthrough

1 24" Round Sidewall Hatch

4 Roof Hatches

1 Exterior Stair Unit

1 Interior Stair Units

2 Drop Down Ladder W/Hatch

4 Training Decks

2 Steel Platforms W Railing

  (In Rappel Tower)

Under Roof Reinforcement

Floor Drains In Burn Areas

1 Forcible Entry Door

1 Standpipe W/Siamese Conn.

2 Globe Fittings

1 36" Confined Space Tube

Toe Kicks (3") For Decks

9 Safety D-Rings

3 Sprinkler Heads

1 Stove Prop

1 Bed Frame Prop

1 Dining Room Table Prop

6 Chair Props

1 Dual Pitch Roof Sim.

   W/2 Chop-Outs

1 Drywall Chop-Out In Roof Sim.

Bloomington

 
Click on the picture to view the slide show

Unit Specifications

11 Total Units

4 Training Levels

1 Vertical Shaft

1 Exterior Stair Unit

3 Interior Stair Units

3 Exterior Training Decks

7 Burn Rooms

2 Rappel Stations

12 Temperature Sensors

1 Temp. Sensor Read-Out Panel

4 Training Deck Areas

1 Self-Contained Gen-Set

1 Ships Ladder

2 Roof Access Hatches

                                 

Chicago

 
Click on the picture to view the slide show

Unit Specifications

9 Total Units

- 6 (40') Horizontal Units

- 1 (20') Horizontal Unit

- 2 (40') Vertical Repel Tower

5 Training Levels

40' Rappel Wall

13 Access Openings (Doors/Windows/Hatches)

1 Exterior Stairwell Units

3 Interior Stairwell Units

Lock Box On All Horiz. Units

4 Exterior Training Decks



Frankfort

 
Click on the picture to view the slide show

Unit Specifications
13 40' ISO Containers
16 Window Units
5 Single Door Units
8 Double Door Units
26 Floor/Roof Hatches
Safety Railing Materials
Steel Center Support
Rappeling Station materials
High/Low Anchor Point
Riser Exterior Staircase
Breezeway/Catwalk
Flashing Throughout
2 Exterior Staircases


Frankfort 2

Huntington

 

Click on the picture to view the slide show

Unit Specifications
3 40' Containers

1 20' Container
4 Training Levels
1 Rappel Station
2 Non Burn Doors
1 Burn Door
2 Fold-Away Burn Partitions
1 Forced Entry Door
7 Non Burn Windows
1 Exterior Stair Unit
1 Interior Stair Units
3 Decks W/Handrail
1 Burn Room
1 RTD System
1 Roof Chop-Out Sim.
1 Burn Hatch
1 Roof Hatch W/Drop-
Down Ladder

Huntley

  

 _________________________________________________________________________

  Jericho                        

              

__________________________________________________________________________

              Millbrook                               Palm Beach

       

__________________________________________________________________________

                  Peotone                                     Rome

   

 __________________________________________________________________________

               Romeoville                              

    

___________________________________________________________________________

                 Stamford                                  St. Clair

      

___________________________________________________________________________

 Townline    Warsaw